Pipex Infrastructure Solutions
Pipex Infrastructure Solutions
  • Home
  • Our Products
  • Our Projects
  • Our Story
  • News
  • Gallery
  • Our Local Partner Offices
  • Testimonials
  • Contact Us
  • More
    • Home
    • Our Products
    • Our Projects
    • Our Story
    • News
    • Gallery
    • Our Local Partner Offices
    • Testimonials
    • Contact Us

  • Home
  • Our Products
  • Our Projects
  • Our Story
  • News
  • Gallery
  • Our Local Partner Offices
  • Testimonials
  • Contact Us

Ezulwini Sustainable Water Supply Project

Project Information

M/s. Esor Construction Pty Limited, South Africa have constructed the water supply pipeline for Swaziland Water and Sewerage Corporation as a part of the African Development Bank financed "Ezulwini Sustainable Water Supply Project" for increasing the supply network to the Ezulwini area. 

Client

Swaziland Water Services Corporation (SWSC)

Financed by

African Development Bank (AfDB)

Consultants

Aurecon Group, Swaziland

Contractor

ESOR Construction Pty Limited, South Africa 

Product Details

M/s. Electrotherm India Limited supplied the 2.9 km long DN 500mm C30 Ductile Iron Pipes to EN 545: 2010 in May 2019 and the pipeline was installed and commissioned in September 2019. 


Total tonnage: 277 MT

Project Status

The pipeline has been installed, tested, commissioned and is now fully operational.

View Completion Certificate

Photo Gallery

    Copyright © 2018 Pipex Infrastructure Solutions - All Rights Reserved.


    Our contact details remain the same

    Learn more