Pipex Infrastructure Solutions
Pipex Infrastructure Solutions
  • Home
  • Our Products
  • Our Projects
  • Our Story
  • News
  • Gallery
  • Our Local Partner Offices
  • Testimonials
  • Contact Us
  • More
    • Home
    • Our Products
    • Our Projects
    • Our Story
    • News
    • Gallery
    • Our Local Partner Offices
    • Testimonials
    • Contact Us

  • Home
  • Our Products
  • Our Projects
  • Our Story
  • News
  • Gallery
  • Our Local Partner Offices
  • Testimonials
  • Contact Us

Valves, Meters and Fittings

Ntungamo Water Supply Project, Uganda

  • Client: Ministry of Water & Environment, Government of Uganda 
  • Consultant: M&E Associates, Uganda
  • Contractor: Vidas Engineering Services Limited, Uganda
  • Products: DI flanged pipes, fittings, couplings, adaptors & valves 
  • Tonnage – 18.5 tons
  • Completed in 2015

Keroka - Isebania Water Supply Project

  • Client: Lake Victoria South Water Services Board (LVSWSB)
  • Project Name: Construction of Short Term Water Supply Works-LVWATSAN II STI
  • Financed by: African Development Bank (AFDB) 
  • Consultants: Gibb Africa Limited
  • Contractor: Zhongmei Engineering Group (Kenya) Limited
  • Products: DI valves, couplings, flange adaptors and specials
  • Completed in 2015

Construction of Lirima Gravity Flow Scheme Water Supply & Sanitation Project - Phase II

  • Client: Ministry of Water & Environment, Government of Uganda 
  • Consultant: SGI - Studio Galli Ingegneria S.r.l.
  • Contractor: Beijing Uni Construction Co. Limited, Uganda 
  • Products: Gate Valves, Air Valves, Float Valves & Bulk Water Meters DN 50-250mm PN16 / PN25 - 3.5 tons (111 pcs.)
  • DI Flanged Pipes, Fittings, Couplings and Adaptors – 17.0 tons
  • Completed in August 2019

Hydraulic Improvement Works at Agoro Irrigation Scheme in Lamwo District

  • Client:  Ministry of Water & Environment (MWE), Govt. of Uganda 
  • Financed by: African Development Bank (AFDB) 
  • Contractor:  Gets Technical Services Limited, Uganda 
  • Products:  Double Gate Valves DN 200-700mm PN10 and Surface Boxes -  Tonnage – 31.0 tons (238 pcs.)  
  •  Completed in Jan 2020 

Construction of New Govt. City at Ihumwa - Dodoma Municipality

  • Client:  Dodoma Urban Water Supply & Sanitation Authority (DUWASA)  
  • Contractor:  Oriental Construction Co. Limited, Kenya  
  • Products:  Gate Valves, Air Valves, Float Valves & Bulk Water Meters DN 50-350mm PN16 / PN25 
  • Tonnage – 3.0 tons 
  •  Completed in 2018 

Extension of Water Transmission Pipeline from Lake Victoria Water Supply Scheme to Kagongwa & Issaka Towns – Lot 1

  • Client:   Ministry of Water & Irrigation, Govt. of Tanzania / Kahama – Shinyanga Water Supply & Sanitation Authority Tanzania  
  • Financed by: African Development Bank (AFDB) 
  • Contractor: Oriental Construction Co. Limited, Kenya  
  • Products: Gate Valves, Air Valves, Butterfly Valves & Meters, DN 50-350mm PN40 -  Tonnage – 10.0 tons  
  • Completed in May 2019 

Construction & Completion of Orkesumet Water Supply Project – Lot II

  • Client: Ministry of Water & Irrigation, Tanzania 
  • Consultant: Shoura Consult Co. Ltd., Sudan
  • Financed by: BADEA + OFID  
  • Contractor: Jandu Plumbers Ltd., Tanzania   
  • Products:   Gate Valves, Butterfly Valves, Check Valves, Air Valves, Bulk Water Meters, Electromagnetic Flow Meters PN16-PN40  
  • Volume: Valves and Meters – 505 pieces (46.5 tons)  
  • Year supplied: Supplies completed in Jan. 2020 – installed and project commissioned in May 2021 

Lot 2 – Construction of Chogoriya Water Supply Infrastructure

  • Client: Tana Water Works Development Authority, Kenya 
  • Consultant: Mangat, I.B. Patel Limited (MIBP), Kenya
  • Financed by: African Development Bank (AfDB) 
  • Contractor: Oriental Construction Co. Limited, Kenya    
  • Products: Valves, Penstocks and Water Meters – DN 50mm to 450mm PN16   
  • Volume:  Tonnage – 17 tons (331 pcs.)   
  • Year supplied:  Completed in May 2020 

Construction Works for Kiptogot-Kolongolo Water Supply Project

  • Client: Rift Valley Water Works Development Authority, Kenya  
  • Consultant: Studio Galli Ingegneria with SARI Consulting 
  • Financed by: African Development Bank (AfDB) 
  • Contractor:  Zhongmei Engineering Group Limited, Kenya    
  • Products: Valves, Penstocks and Water Meters – DN 50mm to 500mm PN16/25    
  • Volume: Tonnage – 48 tons (508 pcs.)    
  • Year supplied: Completed in May 2021 

Photo Gallery

    Copyright © 2018 Pipex Infrastructure Solutions - All Rights Reserved.


    Our contact details remain the same

    Learn more