Year supplied: July-August 2018 ity (ZAWA)
Project Name: Zanzibar Urban Water Supply and Sanitation Project (ZUWSSP)
Contract Title: Package 2: Construction of Scheme Works Infrastructure for Water Supply
Financed by: African Development Bank (AFDB)
Consultant: Don Consult Limited
Contractor: STECOL Corporation, China
Products supplied: Ductile Iron Pipes DN 250mm to 600mm Class K9 Pipes to ISO 2531: 1998 – 21,846 meters & Fittings
Tonnage: 2,370 tons
Year supplied: July-August 2018
The Tanzanian Press has been full of praise for the construction workmanship of STECOL Corporation, the pipelines installed and the speed of installation. The project is commissioned and fully operational.
Copyright © 2018 Pipex Infrastructure Solutions - All Rights Reserved.
Our contact details remain the same